The big truck was here to dump gravel into the backfill space where the french drain would be going.
Dumping Gravel |
Once that was done, the guys removed the snap ties from the concrete and filled the holes, while Greg moved dirt around the lot, filling the gaps and smoothing the soil out.
Backfilled and smoothed |
When Danny arrived, he worked on creating the upper driveway so the upper garage framing could begin tomorrow. Several truckloads of dirt were carried away today. The guys worked late, not leaving until after 5 PM.
Upper driveway It was a struggle, but I managed to complete this posting with my new Apple MacPro. Since I flunked iPhone, this has been a challenge and VERY different and non-intuitive. |
1 comment:
Wow! And here I thought they were almost done for the day when I dropped you off after water aerobics.
Post a Comment