Just prior to the rain, the Greg laid the gravel down for both driveways and the parking pad. To the lower right is the lower garage floor, and the upper garage is above the framing. As of today, Monday Oct 10, two f the upper walls have been framed. Pictures tomorrow.
Upper Driveway (will be asphalt eventually) |
Parking pad |
Plywood that will be laid over the upper garage floor before the concrete is poured |