While the carpenters didn't seem to accomplish much today, the concrete contractors did manage to build the forms for 3 of the 4 (or more) retaining walls. The first 2 pictures of walls, are change orders, that is not included in the original contract, so more money.
There was a lot of debate about whether this wall should be at 90 degrees or at at angle. The decision was to keep it square at 90 degrees. A stairway will eventually be built up to the upper level and a path.
Wall to the Right of the Lower Garage

This picture is of the wall to the left of the man cave on the lower level.
 
And the pony wall, which WAS included in the contract (the picture is the same as the above, so I am now lost).  Concrete pouring is scheduled to occur next Wednesday.
And the work on the upper garage sub floor continues-

More Monday..... 